Skip to content

CASE STUDIES

A Critical Partner for Your Critical Operations

The job of modern-day HVAC & building controls goes far beyond installing and servicing. We partner with you to tackle your most complex problems and help ensure that your buildings run smoothly and in an efficient, technology-enabled, and cost-effective manner.

Enhanced HVAC Reliability and Strategic Planning

A commercial building owner sought a reliable HVAC maintenance provider after experiencing frequent unexpected downtime and high repair costs due to inadequate maintenance practices. The building’s operations were frequently disrupted, impacting tenant satisfaction and overall productivity. Peterson was brought in to provide comprehensive HVAC support and strategic planning.

Revitalizing HVAC Performance Through Preventative Maintenance

A commercial building owner initially chose a low-cost HVAC maintenance provider to manage their HVAC systems, seeking to minimize expenses. However, over two years, the owner discovered that the cheaper provider failed to perform the necessary maintenance required for the specific type of HVAC equipment. This neglect led to frequent breakdowns, higher repair costs, increased utility expenses, and significant operational disruptions.

Boiler Maintenance Overhaul

Client operates a facility with four boilers, each approximately 8 years old. According to the manufacturer, the expected lifespan of these boilers ranges from 15 to 30 years, contingent on factors such as maintenance, usage, installation quality, environmental conditions, and model design. Despite their age, these boilers had not undergone any maintenance since installation, leading to severe operational issues.

BAS System Overhaul for School District

A new customer, referred by a neighboring school district, approached Peterson with significant issues in their Building Automation System (BAS). The existing system, installed by an unknown vendor, was not functioning properly, causing discomfort and operational inefficiencies.

Temporary Cooling for Non Client

A manufacturing facility in Bristol, PA, specializes in paper goods where climate control is crucial for product quality. The facility, spanning 100,000 square feet, faced significant HVAC challenges due to poor maintenance of existing equipment. Peterson was brought in as a referred vendor to address the cooling issues and provide a sustainable solution.

Critical Asset Monitoring in a Healthcare Facility

A proton therapy facility for cancer treatment, which requires uninterrupted operations due to the nature of its services, faced significant risks related to the cooling system of its proton laser. Patients admitted for treatment cannot leave until the completion of their therapy, making reliable and continuous operation of the facility’s critical assets essential.

Healthcare Facility Temporary Cooling Solution

A leading hospital known for its state-of-the-art medical services, faced an unexpected HVAC system failure during a critical summer period. Maintaining an optimal temperature is vital in healthcare settings to ensure patient comfort, prevent equipment overheating, and maintain sterile conditions.

Emergency Boiler Repair for Medical Wing During Holiday Season

A medical wing of a healthcare facility experienced a critical heating failure during the Christmas holiday. The boiler, essential for maintaining a comfortable and safe environment for patients and staff, had a history of poor maintenance and no detailed operational history, leading to its breakdown. Peterson Service Company (PSC) was called in to address the emergency and provide a long-term solution.